The Driveway is Done!
At 9 A.M., I met the contractor at the farm site. We spread the Typar and discussed the plan for the day. The dump truck driver arrived with the first load of gravel at about 9:30 A.M. After that, the contractor spread the gravel while waiting for each successive load to arrive. The loads came […]
The Driveway is Done! Read More »